Daily brief · Brazil

Parati 2026-08-22

In progress — verification after the day closes

Weather-risk signals · signal engine (Open-Meteo)

A heavy rain day could hit

high

A single day could bring around 16.7mm of rain on 2026-08-27 — above the local heavy-rain reference for this time of year (around 10.6mm in a day). Construction, drainage, and outdoor events should review schedules.

construction · outdoor events · drainage operators · agriculture

Water conditions are improving

active

Around 30.2mm of rain has fallen over the past 14 days — above the 0.8mm typical for this period. A healthier water balance is restoring across this area.

hydro operators · agriculture · reservoir ops

What people were seeing · community field reports

No field observations were posted for this place on 2026-08-22.